Why grid connection support matters
G98 and G99 explained plainly
We help you understand which route suits the proposed system and why it matters.
DNO forms are handled with the job
Applications and notifications can be managed as part of the wider installation process.
Help beyond the main install
We can also assist with export-related admin for eligible customers.
The paperwork that lets the system connect properly
Solar grid connection work is the part many people do not think about until forms, diagrams and DNO questions start landing. If your solar PV, battery or export-capable system needs notification or approval, we can handle that as part of the installation process. The correct route depends on the proposed system and the connection characteristics, which is why we check the design before the paperwork starts. In Aberdeen, we explain the practical difference between G98 notifications and G99 applications in plain terms, then gather the details needed for the job rather than leaving you to decode engineering forms at the kitchen table.


From design details to final submission
These applications normally need information such as the system design, inverter details, export arrangements and property connection data. We organise the sequence from design information and submission through DNO response, installation, commissioning and the final notification or documentation that follows. That joined-up approach helps keep the admin in step with the physical job instead of becoming a delay that surfaces late. Where eligible, we can also help with grid payback and export-related administration so the connection process is finished properly, not left hanging once the panels are live.
Frequently asked questions
Why does a solar system need DNO approval or notification?
Solar PV, battery and export-capable systems may need to be notified to or approved by the Distribution Network Operator, depending on the system and the connection characteristics. We check the design and explain the route that applies to the job.
What is the difference between G98 and G99?
They are different routes for connection paperwork, with the correct one determined by the proposed system and how it will connect. We explain the practical difference in plain language and handle the information needed for the relevant submission.
What details are needed for a grid connection application?
The paperwork usually needs system design information, inverter details, export arrangements and property connection data. We gather those details, submit the documentation and keep the process tied to installation and commissioning instead of treating it as a separate afterthought.